Repair work will be carried out on the Queen Elizabeth Bridge, Aberdeen, next month.
The drainage system at the north end of the bridge is failing and potholes are opening up on the carriageway as a result.
The system is to be repaired to allow the bridge to continue functioning properly.
The £150,000 repair work is being funded jointly by Aberdeen City Council and Nestrans, which are paying one-third and two-thirds of the costs respectively.
The work is likely to cause delays and motorists should avoid the area if possible.
Anyone travelling to the ferry terminal, bus station or railway station should allow extra time for their journey in case of delays.
The council's Enterprise, Planning and Infrastructure director Gordon McIntosh said: "The Queen Elizabeth bridge is a key part of the city's infrastructure and is heavily used.
"There is no doubt that the repair works will cause some delays, but we are doing everything we can to mitigate that and have contingency plans in place to introduce extra traffic control measures if they are required.
"The work is essential. Without it, the bridge will deteriorate and we cannot allow that to happen. We will be closely monitoring the work to ensure that it is carried out as quickly as possible."
Nestrans chair, Councillor Kevin Stewart added: "Nestrans recognises the need for this essential repair work to be carried out on this very busy bridge and that recognition is reflected in the level of investment the partnership is putting into the work.
"Unfortunately, the delays which will be caused by the work are almost inevitable, but it is a case of short term pain for long term gain. Avoid the area during the work if you can and make sure you give yourself extra time to reach your destination if you can't avoid it."
The bridge's southbound carriageway will be closed for up to 10 days from Thursday, 1 July, followed by a closure of the northbound carriageway for up to 10 days, immediately following the re-opening of the southbound carriageway.
The bulk of the work will be carried out during the school summer holidays, when the roads are traditionally at their quietest. It has also been timed to coincide with Scottish Gas Networks mains replacement work, to minimise disruption to the travelling public. Turriff Contractors will be carrying out the work on the energy company's behalf and will be working seven days a week from 7am until 7pm to get the job done as quickly as possible.
There will be offside lane closures on North Esplanade West from the Queen Elizabeth Bridge to Market Street in both directions for up to eight weeks from Friday, 2 July.
The mains replacement work will be carried out in three sections, starting at the Queen Elizabeth Bridge and working towards Market Street.
The diversion route for traffic during the southbound closure is North Esplanade West, Victoria Road, Menzies Road and Craig Place. All high sided vehicles must take this route because of the four metre height restriction at Wellington Suspension Bridge.
The diversion route for traffic during the northbound closure of the Queen Elizabeth Bridge is South Esplanade West, Victoria Road and North Esplanade West.
(GK)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
15/11/2024
A major milestone has been reached in the UK's transition to a greener energy future. Ofgem has approved the Eastern Green Link 1 project, a £2.5 billion investment that will see the installation of a 196km subsea electricity cable between Scotland and England. The project, a joint venture between ...
15/11/2024
Falkirk Council has secured a £100 million Growth Deal that is expected to create 1,660 jobs and generate £628 million in economic benefits for the area. The Deal, signed by the UK and Scottish Governments, will fund 11 projects, including: • A Carbon Dioxide Utilisation Centre • A Bioeconomy ...
15/11/2024
The Scottish Plant Owners Association (SPOA) has raised concerns that the measures announced in the Autumn Budget could lead to the demise of the plant hire industry in Scotland. The association argues that the increased tax burden and other economic pressures will have a significant negative ...
15/11/2024
Maxi Construction has been awarded a £1.6 million contract by The City of Edinburgh Council to replace the Reinforced Autoclaved Aerated Concrete (RAAC) roof at Pentland Primary School. The phased project will involve the removal of existing roof coverings and ceilings, the replacement of RAAC ...
15/11/2024
Clark Contracts has been awarded a contract to retrofit Scotland's National Retrofit Centre at BE-ST's Innovation Campus. The project aims to transform the building into a living laboratory, showcasing best practices in non-domestic retrofit. The ambitious project will involve a range of ...
15/11/2024
The Scottish Government has announced plans to bypass the villages of Springholm and Crocketford on the A75, a key route linking Scotland to Ireland. Jacobs UK Ltd has been awarded a contract to undertake initial design and assessment work for the bypass. The project is funded by the UK ...
15/11/2024
Dundee City Council has secured a £693,383 grant from the Scottish Government's Recycling Improvement Fund to upgrade its recycling facilities at Baldovie and Riverside. The funding will be used to purchase new waste management equipment, such as roll packers and compactors, to improve efficiency ...
15/11/2024
Homes for Good and Glasgow Credit Union have formed a partnership to address housing inequality in Glasgow and neighbouring areas. Glasgow Credit Union has provided a £2.4 million loan to Homes for Good, which will be used to purchase up to 35 homes for low-income individuals and families. The ...
15/11/2024
The historic Troon station has reopened following a £5m restoration project. The station was extensively damaged by a fire in 2021. Network Rail, in partnership with AmcoGiffen and CPMS, undertook the rebuild, which included the restoration of the station's iconic façade while incorporating modern ...
15/11/2024
BEAR Scotland, on behalf of Transport Scotland, is undertaking emergency works on the A828 between Ledaig and Benderloch to address a safety concern related to a deteriorating rock face. Recent monitoring has identified a fractured rock mass 60 metres above the road, requiring urgent attention. To ...