Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
18/12/2018

Consultation Launched On Proposed 'Missing' Cycle Link

Construction News Image
Aberdeen City Council has launched an online exhibition to seek people's views into the proposed design for a 'missing' cycling link between the existing cycleway on Wellheads Drive and Dyce train station.

The new shared section would be encouraging people to use active travel – cycling, or walking – in the area and particularly to and from Dyce railway station, Aberdeen International Airport, Victoria Street in Dyce, and industrial and business premises in Wellheads Industrial Estate. It will also benefit people who take public transport to the City Council's new multi-million-pound TECA arena, conference and exhibition spaces when it opens next summer.

The new link will extend the existing shared cycleway along Wellheads Drive to link in with Farburn Terrace at the roundabout, and will create a shared cycleway around the roundabout, along Farburn Terrace (east) to Victoria Street and Farburn Terrace northwards towards the railway station.

The online exhibition and survey of the proposed design are available for people to view here and closes on 28 January, 2019.

-- Advertisement --
NorthernAsbestosServicesLtd

Aberdeen City Council transportation spokesman Councillor Ross Grant said: "This is one of several cycling schemes which have been made public recently by Aberdeen City Council and I hope people who live or work in the Dyce area will take time out of a short part of their day to look and comment on the designs.

"I'd encourage as many people as possible to look at the proposed design and give feedback on it."

The design includes extending the existing 3m wide shared cycleway on Wellheads Drive northwards to the roundabout requiring the existing pavement to be upgraded and redetermined to a 3m wide shared cycleway.

It would also mean the roundabout is to be re-designed to create space for an off-carriageway peripheral 3.5m shared cycleway.

Another aspect of the design is the speed limit on Farburn Terrace (north) which would be reduced to 20mph, as it has a narrow carriageway and pavements which limits the opportunities to create a segregated cycling facility, however, low traffic volumes coupled with a new 20mph speed limit will provide a suitable route for cycling.

On Farburn Terrace (east), the existing pavement would be widened and made into a 3m wide shared cycleway to Victoria Street, with the exception underneath the railway bridge which wouldl be 1.8m.

Funding was secured by Aberdeen City Council from Sustrans and Nestrans to develop the detailed design for the shared cycleway. The section is part of the City's Active Travel Action Plan designed to improve cycling and walking facilities and routes.

The next stage of this project will be to finalise the detailed design, purchase land, promote a Redetermination Order, and secure funding for implementation.

Latest Construction News

15/11/2024

A major milestone has been reached in the UK's transition to a greener energy future. Ofgem has approved the Eastern Green Link 1 project, a £2.5 billion investment that will see the installation of a 196km subsea electricity cable between Scotland and England. The project, a joint venture between ...
15/11/2024

Falkirk Council has secured a £100 million Growth Deal that is expected to create 1,660 jobs and generate £628 million in economic benefits for the area. The Deal, signed by the UK and Scottish Governments, will fund 11 projects, including: • A Carbon Dioxide Utilisation Centre • A Bioeconomy ...
15/11/2024

The Scottish Plant Owners Association (SPOA) has raised concerns that the measures announced in the Autumn Budget could lead to the demise of the plant hire industry in Scotland. The association argues that the increased tax burden and other economic pressures will have a significant negative ...
15/11/2024

Maxi Construction has been awarded a £1.6 million contract by The City of Edinburgh Council to replace the Reinforced Autoclaved Aerated Concrete (RAAC) roof at Pentland Primary School. The phased project will involve the removal of existing roof coverings and ceilings, the replacement of RAAC ...
15/11/2024

Clark Contracts has been awarded a contract to retrofit Scotland's National Retrofit Centre at BE-ST's Innovation Campus. The project aims to transform the building into a living laboratory, showcasing best practices in non-domestic retrofit.  The ambitious project will involve a range of ...
15/11/2024

The Scottish Government has announced plans to bypass the villages of Springholm and Crocketford on the A75, a key route linking Scotland to Ireland. Jacobs UK Ltd has been awarded a contract to undertake initial design and assessment work for the bypass. The project is funded by the UK ...
15/11/2024

Dundee City Council has secured a £693,383 grant from the Scottish Government's Recycling Improvement Fund to upgrade its recycling facilities at Baldovie and Riverside. The funding will be used to purchase new waste management equipment, such as roll packers and compactors, to improve efficiency ...
15/11/2024

Homes for Good and Glasgow Credit Union have formed a partnership to address housing inequality in Glasgow and neighbouring areas. Glasgow Credit Union has provided a £2.4 million loan to Homes for Good, which will be used to purchase up to 35 homes for low-income individuals and families. The ...
15/11/2024

The historic Troon station has reopened following a £5m restoration project. The station was extensively damaged by a fire in 2021. Network Rail, in partnership with AmcoGiffen and CPMS, undertook the rebuild, which included the restoration of the station's iconic façade while incorporating modern ...
15/11/2024

BEAR Scotland, on behalf of Transport Scotland, is undertaking emergency works on the A828 between Ledaig and Benderloch to address a safety concern related to a deteriorating rock face. Recent monitoring has identified a fractured rock mass 60 metres above the road, requiring urgent attention. To ...
Morris & Spottiswood LtdRBT Underfloor LimitedToner Damp Proofing SuppliesNo HydroSEEIT3DCF Concrete PumpingMaccaferri LtdSMS Alba LimitedDiscount Kitchens and Bathrooms LtdShopfronts Scotland
Terms and Conditions
2024/11/16 06:33:29