Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
06/07/2021

SSEN Explores EV Accessibility For People With Disabilities

Construction News Image
A new report has been published outlining the key barriers and challenges in electric vehicle (EV) uptake for vulnerable and disabled motorists.

Scottish and Southern Electricity Networks (SSEN) has published the report as part of its project Equal EV. The project will now examine potential solutions for addressing the obstacles identified and how different services can best support vulnerable and drivers in the EV transition.

Transport is the UK's highest emitting sector, accounting for around a third of UK carbon emissions annually. Both the UK and Scottish Governments have set ambitious targets to address this, including banning the sale of new diesel and petrol vehicles by 2030, and are seeking to accelerate the transition to decarbonised transport.

With approximately 2.9 million blue badge holders in 2020 in the UK, Equal EV is examining the barriers and challenges vulnerable and disabled motorists face in the transition to EVs and how to best address them. As part of the Project's first phase, and alongside project partner Disabled Motoring UK, a comprehensive literature review and interviews were undertaken with disabled and vulnerable motorists, and automotive industry experts and organisations. Four primary barriers to EV uptake were identified:

• Accessibility of chargepoints, to ensure drivers can access and use chargepoints

• Costs, including high upfront costs and additional costs for modifications

• Range anxiety, including ensuring disabled motorists do not become vulnerable if EVs run out of charge

-- Advertisement --
NorthernAsbestosServicesLtd

• Different manufacturers and charging compatibilities requires drivers to seek specific guidance and support

Whilst some of the barriers identified are similar to those commonly identified by other drivers, the report has demonstrated the need for additional provisions and considerations to address accessibility and mobility barriers. For example, whilst drivers may be concerned with EV range, few would need to take into consideration the accessibility of different EV chargepoints, such as the weight of cables, height of charging stations, and suitability of parking arrangements. Additionally, few drivers would also have to consider becoming more vulnerable in the event of an EV running out of charge.

The Report's findings are summarised into three key areas for industry, manufacturers, and operators to address. First, implementing common regulation and standards in charging equipment available to reduce the number of incompatible and costly offerings. Second, ensuring common standards are available at chargepoints, such as designated parking spaces, dropped kerbs, and equipment being accessible for disabled and vulnerable motorists. Finally, the report identifies a need for collaborative action between industry, government, network operators and stakeholders in addressing these barriers and obstacles.

SSEN is strongly committed to supporting a cost-effective, secure, and inclusive transition to net zero. This means ensuring opportunities are open to all customers and infrastructure is developed in a fair and accessible manner.

The next phase is bringing together different stakeholders, such as automotive and chargepoint industry groups and manufacturers, and national and local governments, to identify opportunities, gaps, and different stakeholder responsibilities. Areas being examined include home charging, using EVs as a back-up power supply for a house, vehicle-to-grid export solutions, and ensuring public chargepoints and chargepoint equipment are accessible. As part of this, the learnings from the Project's first phase are being shared with industry stakeholders and the automotive industry, government, and the energy sector.

Lisa Doogan, Head of Customer Service and Stakeholder Strategy at SSEN said: "We are committed to supporting our customers in a fair and equitable transition to net zero. With millions of blue badge holders throughout the UK, Equal EV is delivering key findings for how vulnerable and disabled motorists can be supported in the transition to EVs.

"We are proud to be playing a leading role in the transition to EVs for disabled and vulnerable motorists. The project's next phase will seek to address the obstacles and barriers identified and seize the opportunity to create a fair and accessible net zero future for all."

The full report on Equal EV's first phase can be found here. Equal EV is an 18-month Network Innovation Allowance (NIA) project which began November 2020 and secured £310,000 in NIA funding.

Latest Construction News

29/11/2024

Construction has begun on the initial phase of Spaceport 1, a sub-orbital launch site in the Outer Hebrides. Local contractor, Macaulay Askernish Ltd, has been awarded a contract by Comhairle nan Eilean Siar to undertake enabling works at Scolpaig Farm in North Uist. The project, funded by a £947k ...
29/11/2024

David Smith Contractors Ltd, a local firm based in Fraserburgh, has been awarded a multi-million-pound contract to contribute to the construction of the Eastern Green Link 2 (EGL2) project. The company will undertake civil engineering works at the converter station site near Boddam, Peterhead. ...
29/11/2024

Scotland has unveiled a new plan to become a leading exporter of renewable hydrogen by 2030. The plan, titled 'A Trading Nation: Realising Scotland's Hydrogen Potential – A Plan for Exports', outlines specific actions needed to achieve this goal. The Scottish Government aims to capitalize on the ...
29/11/2024

First Minister John Swinney has welcomed the progress being made in the construction of the new Perth High School during a recent site visit. The new three-storey building, being delivered by Robertson Construction Tayside on behalf of hub East Central Scotland, will accommodate up to 1,600 pupils ...
29/11/2024

Glasgow City Council has given the green light to the sale of four land plots in the city to facilitate various development projects. The sites in question are located in Carmyle, Deaconsbank, Maryhill, and Port Dundas. The disposals are expected to generate significant capital receipts for the ...
29/11/2024

Scottish Water is set to achieve a significant milestone in its woodland creation programme, planting over 500,000 trees by the end of the current planting season in March 2025. This year, the company will plant more than 245 hectares of native woodland across various sites, including Loch ...
28/11/2024

Construction has begun on a new £33 million student accommodation development in Glasgow city centre. The project, a partnership between Artisan Real Estate and Homes for Students, will provide 321 self-contained studio apartments at 292-298 St Vincent Street. The existing office building on the ...
28/11/2024

Springfield Properties has submitted detailed plans to Midlothian Council for the first phase of its new Lingerwood development. The proposed development, located off Stobhill Road near Newtongrange, will eventually include around 1,000 homes. The first phase will comprise 63 homes, ranging from ...
28/11/2024

Scottish Land & Estates (SLE) has called on the Scottish Government to prioritise the needs of rural communities in the upcoming Scottish Budget. Dee Ward, Chair of SLE, has urged the Finance Secretary, Shona Robison, to conduct a robust rural impact assessment for all spending and taxation ...
28/11/2024

Four Scottish electrical apprentices have been praised for their performance in the prestigious SkillELECTRIC competition. John-Ross Campbell, Kalum Low, Milly Smith, and Ewan Thomas, all SETCTT apprentices, represented Scotland in the UK-wide competition, which was held at Oldham College. Milly ...
Morris & Spottiswood LtdRBT Underfloor LimitedSEEIT3DCF Concrete PumpingMaccaferri LtdDiscount Kitchens and Bathrooms LtdShopfronts ScotlandJSJ Foam Insulation LtdEarth Tech LPS LTDSolway Ecology Consulting Ltd
Terms and Conditions
2024/11/29 23:29:12