Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
27/02/2023

Revised Lomond Banks Development Plan Submitted

Construction News Image
Revised plans for Lomond Banks – the proposed £40m world class sustainable tourism destination in Balloch – have been submitted for consideration.

The resubmission follows ongoing community feedback throughout the planning application process and a recent request from Loch Lomond and Trossachs National Park Authority to ensure the proposals further meet the vision for the area at West Riverside and Woodbank House, which has been identified for tourism development.

Having considered all of the feedback from the Park Authority, the community, and stakeholders alike we have made some significant amendments to support questions raised around, scale of development and the environment, including biodiversity and ecology and traffic and parking.

Some of the major changes include the complete removal of the proposed Area 10 from within the application's red line boundary, with existing woodland retained instead. The previously proposed staff accommodation and facilities will now be absorbed into other areas of the development including Station Square, Woodbank House and Visitor Hub.

The density of holiday accommodation at Woodbank House has also been significantly reduced, by removing all 17 woodland bothies alongside five woodland lodges from this development area. Existing non-native and invasive species will also be removed and replaced with native trees and planting instead.

The reduced scale of development has produced further opportunities to plant more trees, enhancing the woodland setting for many of the self-catering lodges. It has also allowed the retention of all trees in Area 10 (the former area set aside for staff facilities area) and increased native tree planting at Woodbank, resulting in higher net biodiversity gain compared to the original proposals submitted.

-- Advertisement --
NorthernAsbestosServicesLtd

Further still, we have also committed to retaining the amount of previously proposed compensatory planting, ensuring there is no reduction in terms of their input to biodiversity value.

Jim Paterson, Development Director for Lomond Banks, said: "We have been committed to listening to the National Park, the local community, local businesses and all other key stakeholders, and their feedback to date has really helped to shape our plans into something that fits the vision for a tourism business of the future, which Balloch and the wider Loch Lomond area could truly benefit from.

"We welcomed this latest feedback from the Park Authority and much of it aligned with what we were hearing from the community. We got to work to modify the proposals accordingly with our partners by removing Area 10, retaining more trees, bringing down lodge and bothy numbers and ensuring an overall higher net biodiversity gain."  

We have also provided further information on our parking strategy to reassure the National Park on the ample provision we have put in place across the development for the facilities that will be on offer. We have also provided further traffic statistics for different times of the year to indicate the uptake on traffic numbers at key locations in and around the area at peak times.

Jim added: "I must be very clear that the opposition is using traffic and parking as a scaremongering tool and their statistics and conclusions are simply not accurate. Whilst we do appreciate the road network is an ongoing concern for those living around the A82, our surveys have indicated that the development simply will not bring the concentrated numbers at peak times that it is being accused of and we have mitigated this further by introducing measures such as staggered check-in and check-out times to ensure this is not the case.

"All traffic surveys submitted to our statutory consultees West Dunbartonshire Council Roads Department have, to date, been satisfactory. We have also submitted a comprehensive parking strategy to the National Park and conducted further surveys through peak seasons to submit to the Parks Authority. Alongside this, we have made a number of commitments to join working groups to look at sustainable travel planning and eco-travel at the venue, to help ease congestion for the longer term."

In addition to traffic and transport the National Park asked us to provide assurances around the location and position of the John Muir Way, as a walkway of national importance. We have clarified this and assured once again our position on providing permanent access to all.

Jim concluded: "Our commitment to Balloch shines through with this amended submission. We have been steadfast in our dedication to making this submission about the community and it has been very much shaped by their voice and opinion. The plans blend the natural beauty and ecology of the area with the local business opportunities alongside the rejuvenation of Woodbank House – bringing back to life a forgotten treasure.

"We believe, our proposals continue to fulfil the objectives set out in the Local Development Plan and in the Balloch Charrette and that these revisions address the matters raised by interested parties, benefitting the area, in a manner that both the local and wider community can be truly proud of for generations to come."

The resubmission triggers a 30-day consultation period with all statutory consultees before the application can be progressed and determined by Loch Lomond and the Trossachs National Park Authority.

Latest Construction News

15/11/2024

A major milestone has been reached in the UK's transition to a greener energy future. Ofgem has approved the Eastern Green Link 1 project, a £2.5 billion investment that will see the installation of a 196km subsea electricity cable between Scotland and England. The project, a joint venture between ...
15/11/2024

Falkirk Council has secured a £100 million Growth Deal that is expected to create 1,660 jobs and generate £628 million in economic benefits for the area. The Deal, signed by the UK and Scottish Governments, will fund 11 projects, including: • A Carbon Dioxide Utilisation Centre • A Bioeconomy ...
15/11/2024

The Scottish Plant Owners Association (SPOA) has raised concerns that the measures announced in the Autumn Budget could lead to the demise of the plant hire industry in Scotland. The association argues that the increased tax burden and other economic pressures will have a significant negative ...
15/11/2024

Maxi Construction has been awarded a £1.6 million contract by The City of Edinburgh Council to replace the Reinforced Autoclaved Aerated Concrete (RAAC) roof at Pentland Primary School. The phased project will involve the removal of existing roof coverings and ceilings, the replacement of RAAC ...
15/11/2024

Clark Contracts has been awarded a contract to retrofit Scotland's National Retrofit Centre at BE-ST's Innovation Campus. The project aims to transform the building into a living laboratory, showcasing best practices in non-domestic retrofit.  The ambitious project will involve a range of ...
15/11/2024

The Scottish Government has announced plans to bypass the villages of Springholm and Crocketford on the A75, a key route linking Scotland to Ireland. Jacobs UK Ltd has been awarded a contract to undertake initial design and assessment work for the bypass. The project is funded by the UK ...
15/11/2024

Dundee City Council has secured a £693,383 grant from the Scottish Government's Recycling Improvement Fund to upgrade its recycling facilities at Baldovie and Riverside. The funding will be used to purchase new waste management equipment, such as roll packers and compactors, to improve efficiency ...
15/11/2024

Homes for Good and Glasgow Credit Union have formed a partnership to address housing inequality in Glasgow and neighbouring areas. Glasgow Credit Union has provided a £2.4 million loan to Homes for Good, which will be used to purchase up to 35 homes for low-income individuals and families. The ...
15/11/2024

The historic Troon station has reopened following a £5m restoration project. The station was extensively damaged by a fire in 2021. Network Rail, in partnership with AmcoGiffen and CPMS, undertook the rebuild, which included the restoration of the station's iconic façade while incorporating modern ...
15/11/2024

BEAR Scotland, on behalf of Transport Scotland, is undertaking emergency works on the A828 between Ledaig and Benderloch to address a safety concern related to a deteriorating rock face. Recent monitoring has identified a fractured rock mass 60 metres above the road, requiring urgent attention. To ...
Morris & Spottiswood LtdRBT Underfloor LimitedJSJ Foam Insulation LtdEarth Tech LPS LTDSolway Ecology Consulting LtdPerfect View Aerial FilmingBurnside Plant Hire LtdSips Eco Panel Systems LtdM K M Building Supplies LtdAlternative Tying Systems Ltd
Terms and Conditions
2024/11/16 06:23:53