Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
07/12/2011

Visitor Centre To Rise From Bannockburn

Archaeologists are continuing preliminary investigations at the site of the new visitor centre for the Battle of Bannockburn.

Following earlier excavations in October, the team are digging for the position of the Borestone where Robert the Bruce raised his banner before the battle of Bannockburn in 1314 where the Rotunda now stands.

The Rotunda, built in 1964 to mark the 650th anniversary of the battle, is badly in need of repair and structural engineers are assessing the work required. As part of the project a full Conservation Plan was completed for the rotunda by the conservation architect Andrew Wright.

Cabinet Secretary for Culture and External Affairs Fiona Hyslop said: "The work to create a new visitor centre at the site of the Battle of Bannockburn is continuing well with this second round of archaeology ensuring that nothing of importance is lost during the building work.

"We may still be some way off the opening in time for the 700th anniversary in 2014 but it is vital that we push ahead with this work to preserve any remaining archaeology and use these findings to add to our understanding and reflect it in the state of the art interpretation that will make this centre a world-class attraction.

"The new centre will just be the latest commemoration of this incredible site and this particular series of excavations is hugely interesting because it is looking at the legacy of the site as a memorial and the way that people have memorialised and interacted with it throughout the centuries."

-- Advertisement --
NorthernAsbestosServicesLtd

The new centre has been designed by award-winning architects Reiach and Hall as part of the project to enhance the presentation of the battle and its significance to our history in time for the 700th anniversary of the battle in 2014.

In addition to the Rotunda, the site is also the focus for other memorials to the battle: the famous Pilkington-Jackson statue of Bruce, a cairn built in 1957, and the flagpole erected in 1870.

Derek Alexander, Head of Archaeological Services for the National Trust for Scotland, said: "The first memorial to the battle was in fact the Borestone itself: a flat stone with a circular hole 4 inches in diameter and 4 inches deep. Tradition has it that the Borestone was the socket in which Robert Bruce, King of Scots, raised his standard prior to the battle and marks the site of the Scots camp. The site has been visited by tourists since the 18th century, including Robert Burns, and an engraving of 1826 shows it beside the road in an open rural landscape.

"We are hoping that in addition to the position of the Borestone we may find objects dropped or even deliberately placed and left by visitors to the site over the last couple of hundred years – it certainly worth investigating."

Over the years numerous visitors chipped off parts of the Borestone, to take home as souvenirs, and by the middle of the 19th century the fragments had to be protected by an iron grille set into a low stone wall and the site was staffed by a custodian.

During the building of the rotunda in the 1960s the precise location of the original Borestone was cleared and re-surfaced and the last two fragments transferred into the new visitor centre for safe-keeping.

The current archaeological investigations are looking for the site of the original Borestone itself, which may be marked by a bed of mortar. Another trench will also be excavated over one end of the 19th century custodian’s hut. In both trenches it is hoped there may be artefacts dropped by visitors to the site over the last 300 years.

The proposal for the new visitor centre was announced in 2009 with £5m funding from the Scottish Government. An application for £3.8m has received a stage one pass from the Heritage Lottery Fund with a final decision hoped for early in 2012.

2014 will be a huge year for events in Scotland – as well as the 700th anniversary of the Battle of Bannockburn, Scotland will also play host to the Commonwealth Games and The Ryder Cup.

(GK)

Latest Construction News

26/11/2024

Scottish Water has unveiled its largest-ever procurement initiative, aiming to modernise the nation's water and wastewater infrastructure while safeguarding the environment. The program, named Delivery Vehicle 4, is valued between £5 billion and £9 billion and is set to run from 2027 to 2033, with ...
26/11/2024

The City of Edinburgh Council has granted planning permission, subject to conditions, for the refurbishment of Calton Square, an office building currently occupied by Baillie Gifford until the end of December 2025. Promoted by Ardstone Capital on behalf of Manova Partners, the project aims to ...
26/11/2024

First Minister John Swinney, MSP for Perthshire North, praised the progress being made on the construction of the new Perth High School during a visit on Friday, 22 November. He was joined by Jim Fairlie, MSP for Perthshire South and Kinross-shire, alongside senior Perth and Kinross Councillors, ...
26/11/2024

A state-of-the-art playpark has officially opened at King George V Park in Bearsden, following the completion of a £100,000 refurbishment. Funded by a combination of East Dunbartonshire Council (EDC) Capital Funding and the Scottish Government’s Renewing Scotland’s Play Parks initiative, the ...
26/11/2024

Fife Council has launched a public consultation, inviting residents, businesses, and organizations to contribute ideas and propose sites for inclusion in the next Local Development Plan, known as Fife's Place Plan. The council is calling on community councils, landowners, and developers to share ...
26/11/2024

The Chief Executive of East Lothian Council has announced she is to retire in February 2025. Monica Patterson who has been Chief Executive for almost five years, has spent most of her professional career working in local government. Prior to joining East Lothian Council in 2010, she was Head of ...
25/11/2024

West of Scotland Housing Association (WSHA) and Connect Modular have jointly submitted a planning application to Glasgow City Council for the development of 33 affordable homes in Cowlairs. This project aligns with the wider Cowlairs Park regeneration scheme and the city's ambitious housing ...
25/11/2024

Arc-Tech (Scotland) has successfully completed a £6m Mechanical and Electrical (M&E) services package for the Lost Shore Surf Resort in Edinburgh. The state-of-the-art resort, which opened its doors earlier this month, features a range of amenities, including a wave pool, luxury lodges, and ...
25/11/2024

Scottish Water has successfully completed the construction of a groundbreaking hydro energy generation scheme at Whiteadder Reservoir in East Lothian. This innovative project, believed to be the first of its kind in Europe, will harness the power of water to offset a significant portion of the ...
25/11/2024

Work is set to commence on a £6.5 million project to upgrade the Double Dykes Gypsy/Traveller site near Perth. The initiative aims to replace outdated chalets with modern, energy-efficient accommodation and implement significant site improvements. Perth & Kinross Council secured £3.9 million from ...
RBT Underfloor LimitedMorris & Spottiswood LtdSuperior Exterior CleaningIBT Building & Timber (Merchants) LtdLionheart RoofingRamsay & Sons [Forfar] LtdSynergy Lifting SolutionsSynergy Training SolutionsBabbity EnvironmentalMaterials Market UK Trading Ltd
Terms and Conditions
2024/11/26 14:33:07